Quick answer: A PM Surya Ghar application that is “stuck at DISCOM” is not one problem. First identify the exact stage: application transfer, technical feasibility, document correction, installation, inspection, net metering, commissioning, portal synchronisation, bank details, or subsidy. Then contact the organisation that owns that stage with the application ID, dates, and missing action.
- Portal/IT issue: consumer details, upload, application transfer, editing, or status sync.
- DISCOM issue: feasibility, inspection, net metering, commissioning, metering/billing.
- Vendor issue: installation, documents, serials, testing, completion evidence.
- Subsidy issue: bank details, eligibility, payment amount, or post-commissioning processing.
Use the stage, owner, proof method
| What is stuck | Likely owner | Evidence to ask for |
|---|---|---|
| Application not reaching DISCOM / upload or edit problem | Portal/IT support | Application ID, error screenshot, backend/status reference |
| Technical feasibility pending | DISCOM | Feasibility application/service reference and decision/status |
| Installation done, inspection pending | DISCOM + vendor readiness | Completion submission and inspection request/acknowledgement |
| Inspection done, net meter pending | DISCOM | Inspection completion + net-meter work/order reference |
| DISCOM says complete, portal unchanged | DISCOM data hand-off / portal sync | Completion/data-push timestamp and portal grievance |
| Commissioned, subsidy still pending | Scheme/subsidy workflow | Commissioning status, bank details, subsidy-stage reference |
When DISCOM and portal blame each other
- Save a dated screenshot of the portal stage.
- Get the DISCOM/service reference for the same application.
- Ask the DISCOM: “What exact stage is complete, on what date, and what reference/data push proves it?”
- Ask portal support: “Which exact input/action is still missing from this application ID?”
- Put both answers in one grievance rather than opening unrelated tickets.
- If the vendor is the missing owner, ask for the specific document/installation completion submission they made.
Use the right grievance door
The National Rooftop Solar grievance page distinguishes scheme questions from portal/IT problems and publishes DISCOM contact/grievance details. Its implementation material also identifies delays in feasibility, net metering and commissioning as DISCOM issues. That is why “application pending” is too vague: your complaint should name the exact stage.
What counts as fixed
Do not stop when somebody says “done”. The portal and the stage-owning DISCOM record should agree, and you should have the acknowledgement/reference for the completed step. Then move to the next stage.
Official sources
- PM Surya Ghar — current consumer scheme/application portal.
- National Rooftop Solar grievance page — scheme and portal/IT support routes.
- DISCOM contact and grievance details — utility contact information published by the national portal.
- Ministry of New and Renewable Energy — current programme information.