← Full guide: Solar Product vs Performance Warranty: How to Build a Claim

Five promises that are often bundled into one sales pitch

Five promises that are often bundled into one sales pitch. Check the cause, evidence to keep, recovery steps, and escalation.

Start here

Duration alone is a poor comparison. A long performance warranty with a narrow remedy can be less useful than a shorter product warranty with clear labour and logistics coverage.

What applies to this exact problem

DocumentTypical subjectWhat it does not automatically cover
Module product warrantyManufacturing or material defect in a moduleLow output caused by shade, dirt, design or other equipment
Module performance warrantyMaximum degradation or minimum output under stated test conditionsYour household bill, annual rupee savings or whole-system uptime
Inverter/optimizer warrantyCovered failure of that deviceModules, mounting, wiring workmanship or grid outages
Installer workmanship warrantyInstallation defects such as specified wiring, mounting or sealing workA manufacturer’s internal component defect
Insurance or service planOnly the named accidental, weather, theft or maintenance eventsAnything excluded, depreciated or outside the policy period

Duration alone is a poor comparison. A long performance warranty with a narrow remedy can be less useful than a shorter product warranty with clear labour and logistics coverage.

Check these first

  • State the exact expected result and the exact result you have now.
  • Find the official record that owns the result and compare it with your evidence.
  • Change one thing at a time, then verify the final state before moving on.

Fix it in this order

  1. State the exact expected result and the exact result you have now.
  2. Find the official record that owns the result and compare it with your evidence.
  3. Separate hardware, installer, DISCOM/net-meter, portal, and subsidy status. They are different failure points.
  4. Record system size, module/inverter details, commissioning date, generation data, application IDs, and promised scope.
  5. Compare actual installation and generation with the signed quote, warranty, and portal/DISCOM records.
  6. Ask the responsible party for the exact pending action and owner of that action in writing.
  7. Do not close the job until safety checks, commissioning, monitoring, and applicable net-meter/subsidy records reconcile.

Build the proof pack

  • Signed quote and scope
  • Module/inverter serials and warranty
  • DISCOM/portal application IDs
  • Generation data, photos, and installer tickets

Avoid making the case harder

  • Paying the final amount before checking agreed milestones
  • Assuming low generation is automatically a bad panel
  • Treating installer completion as DISCOM/subsidy completion

How you know it is really fixed

  • The official record and your real-world result agree.
  • You have enough written evidence to prove the issue is finished if it returns later.

If it is still not fixed

  1. Installer/vendor grievance
  2. DISCOM/portal grievance route
  3. Consumer forum or other official remedy where appropriate

Official sources from the full guide

Need the complete context?

This page solves one branch. The parent guide covers the full decision, edge cases, alternatives, and related checks.

Open the full guide