Size the battery from essential energy, not the inverter label

Size the battery from essential energy, not the inverter label. Check the cause, evidence to keep, recovery steps, and escalation.

Start here

Start with the loads that must run during an outage. A 5 kW inverter does not mean you need 5 kWh of battery, and a 5 kWh battery does not necessarily deliver 5 kWh of usable AC energy. Usable capacity is reduced by permitted depth of discharge, conversion losses, temperature and battery ageing.

What applies to this exact problem

Start with the loads that must run during an outage. A 5 kW inverter does not mean you need 5 kWh of battery, and a 5 kWh battery does not necessarily deliver 5 kWh of usable AC energy. Usable capacity is reduced by permitted depth of discharge, conversion losses, temperature and battery ageing.

Build the load-hours worksheet

LoadWattsQuantityHoursWh
FansW eachnhW × n × h
LightsW eachnhW × n × h
RefrigeratorUse measured/estimated duty cycle1hAverage W × h
Router/laptopWnhTotal

Add the watt-hours, then divide by expected inverter/system efficiency and by the usable fraction of nominal battery capacity. Finally add an ageing/reserve margin. For example, if essential loads need 3,000 Wh and you assume 90% conversion efficiency and 80% usable depth of discharge, the theoretical nominal requirement is roughly 3,000 ÷ 0.9 ÷ 0.8 = 4,167 Wh before ageing reserve.

Power and energy are different constraints

The battery must supply enough energy for the required hours, while the inverter and battery must also support the instantaneous power and surge of loads such as refrigerators, pumps or motors. A battery can have enough kWh but still fail if the system cannot deliver the startup surge.

Do not size from one perfect-day solar assumption

If the battery is meant for outage resilience, decide what happens during cloudy weather and multi-hour grid failures. Separate “daily solar self-consumption” from “emergency reserve”. A system optimised to discharge deeply every evening may have little backup left when the grid fails at night.

Check the safety and warranty envelope

Use equipment and installation practices consistent with manufacturer specifications and applicable Indian electrical/safety requirements. Consult current guidance from MNRE, the Central Electricity Authority and relevant BIS standards. Battery chemistry, ventilation, protection, earthing and installation location are safety decisions, not only efficiency choices.

Decision rule: size from essential Wh, surge W, usable depth of discharge, efficiency and ageing reserve. If a vendor cannot show all five assumptions, the quoted battery size is not yet auditable.

Check these first

  • State the exact expected result and the exact result you have now.
  • Find the official record that owns the result and compare it with your evidence.
  • Change one thing at a time, then verify the final state before moving on.

Fix it in this order

  1. State the exact expected result and the exact result you have now.
  2. Find the official record that owns the result and compare it with your evidence.
  3. Separate hardware, installer, DISCOM/net-meter, portal, and subsidy status. They are different failure points.
  4. Record system size, module/inverter details, commissioning date, generation data, application IDs, and promised scope.
  5. Compare actual installation and generation with the signed quote, warranty, and portal/DISCOM records.
  6. Ask the responsible party for the exact pending action and owner of that action in writing.
  7. Do not close the job until safety checks, commissioning, monitoring, and applicable net-meter/subsidy records reconcile.

Build the proof pack

  • Signed quote and scope
  • Module/inverter serials and warranty
  • DISCOM/portal application IDs
  • Generation data, photos, and installer tickets

Avoid making the case harder

  • Paying the final amount before checking agreed milestones
  • Assuming low generation is automatically a bad panel
  • Treating installer completion as DISCOM/subsidy completion

How you know it is really fixed

  • The official record and your real-world result agree.
  • You have enough written evidence to prove the issue is finished if it returns later.

If it is still not fixed

  1. Installer/vendor grievance
  2. DISCOM/portal grievance route
  3. Consumer forum or other official remedy where appropriate